Rehabilitation of the 66 kV line between al-Darbasiyah and Ras al-Ain to ensure stable power supply for the al-Hasakah water station
Syrian Ministry of Energy (TG) · Governmental · telegram.org
- Arabic title
- إعادة تأهيل خط 66 ك.ف بين الدرباسية – رأس العين لضمان استقرار تغذية محطة مياه الحسكة
- English title
- Rehabilitation of the 66 kV line between al-Darbasiyah and Ras al-Ain to ensure stable power supply for the al-Hasakah water station
- Published
- UTC
- Topic
- Displacement, Humanitarian, Politics
- Governorate
- Raqqa