With a completion rate of 40%.. construction works continue on al-Siyasa Bridge linking the two banks of the Euphrates River in Deir ez-Zor
Al-Ekhbariya Syria TG · Governmental
- Arabic title
- بنسبة إنجاز بلغت 40%.. استمرار أعمال إنشاء جسر السياسية الرابط بين ضفتي نهر الفرات في دير الزور
- English title
- With a completion rate of 40%.. construction works continue on al-Siyasa Bridge linking the two banks of the Euphrates River in Deir ez-Zor
- Published
- UTC
- Topic
- Politics
- Governorate
- Deir ez-Zor